![]() Road is concrete pavement with 6 lanes for the main road and 4 lanes for sub-road. The right of way for main road and sub-road is 39 and 26 meters respectively. |
![]() The water is supplied from deep wells in the Park. The capacity is designed to be of 7m3/rai/day. |
![]() The sub-station is planned with the total power capacity of 150 MVA to convert 115 KV currency to 22 KV. |
![]() The Waste Water Treatment system designed to treat the waste water at the capacity of 5.6 m3/rai/day in average. |
![]() Total 600 lines be available through telephone terminal in the park. |
![]() The Incinerator will be built with burning capacity of 12,000 kgs.per day. |