Road is concrete pavement with 6 lanes for
the main road and 4 lanes for sub-road.

The right of way for main road and sub-road
is 39 and 26 meters respectively.







The water is supplied from deep wells in the Park.


The capacity is designed to be of 7m3/rai/day.









The sub-station is planned with the total
power capacity of 150 MVA to convert
115 KV currency to 22 KV.









The Waste Water Treatment system designed
to treat the waste water at the capacity
of 5.6 m3/rai/day in average.









Total 600 lines be available through
telephone terminal in the park.










The Incinerator will be built with burning
capacity of 12,000 kgs.per day.